Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Pre-heat switched ON (turn comfort switch to C position)
NO CH or DHW demand
Attach temperature clamp to flow pipe of the primary heat exchanger
Ensure boiler is cool, a demand for pre-heat (this can be achieved by running a hot water tap with the gas OFF at the boiler until cool)
NO CH or DHW demand
Attach temperature clamp to flow pipe of the primary heat exchanger
Ensure boiler is cool, a demand for pre-heat (this can be achieved by running a hot water tap with the gas OFF at the boiler until cool)
Gas On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Reset appliance if required (press reset button for 2 seconds and release).
Turn ON a hot water tap, allow the boiler to ignite and establish then turn hot water tap OFF.
With pre-heat switched ON, the boiler should heat the primary heat exchanger to approximately 50 - 70°C then shut down.
Does the boiler perform pre-heat function correctly?
Turn ON a hot water tap, allow the boiler to ignite and establish then turn hot water tap OFF.
With pre-heat switched ON, the boiler should heat the primary heat exchanger to approximately 50 - 70°C then shut down.
Does the boiler perform pre-heat function correctly?