Set Appliance State:
Isolate Mains Power to appliance as per TOPs P4
Measurement:
Remove Electrode lead and Electrode from the boiler.
Check Electrode Lead and Electrode for continuity and examine for signs of damage.
Check Electrode Lead and Electrode for continuity and examine for signs of damage.

Isolate as per TOPs P4
and refit as necessary