Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
Gas Off
Loosen the screw of the inlet pressure test point (on the isolation valve) and attach a pressure gauge
Loosen the screw of the inlet pressure test point (on the isolation valve) and attach a pressure gauge
Gas On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Monitor the pressure on the U-gauge.
As the boiler enters the sparking phase of its ignition sequence the inlet gas pressure should drop slightly but should stay above 18mb throughout.
Note:
After this test remove the gauge and make sure all disturbed gas connections are checked for tightness.
As the boiler enters the sparking phase of its ignition sequence the inlet gas pressure should drop slightly but should stay above 18mb throughout.
Note:
After this test remove the gauge and make sure all disturbed gas connections are checked for tightness.
Isolate as per TOPs P4
and refit as necessary