Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
User display control set to HW and CH
Gas On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Allow the ignition sequence to commence and burner to ignite.
Measure the voltage between the red wire on connection X13 and the neutral at the incoming mains terminal strip with the connector attached to the PCB.
Expect mains voltage.
Note:
It is recommended to ensure the boiler has definitely fired for CH demand before checking the voltage as the boiler incorporates a built in delay.
Measure the voltage between the red wire on connection X13 and the neutral at the incoming mains terminal strip with the connector attached to the PCB.
Expect mains voltage.
Note:
It is recommended to ensure the boiler has definitely fired for CH demand before checking the voltage as the boiler incorporates a built in delay.

Isolate as per TOPs P4
and refit as necessary