Set Appliance State:
CH Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Allow the burner to ignite and boiler to run in CH mode for at least 1 minute.
End the CH demand.
Monitor the pump, it should overrun for 4 minutes.
Does the pump overrun operate as expected?
End the CH demand.
Monitor the pump, it should overrun for 4 minutes.
Does the pump overrun operate as expected?