Set Appliance State:

Mains Power Off
Set Multimeter to AC Volts Set meter to measure AC Volts
Use insulation mat as necessary
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

All electrical heating controls calling.
Measure voltage across terminal marked 1 (live) and terminal marked N (neutral) of the eight terminal connector block.
Terminals are numbered from the left after Neutral, Earth and Live connections.