Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
Selector switch to DHW position
CH temperature selector to Min
DHW temperature selector to Max
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow fan to run and ignition sequence to commence.
Measure the voltage at connection 1 live (blue wire, numbers run right to left) and connection 3 neutral (red wire) connector M3 on the ignition PCB.
Note:
Voltage will only be present during sparking phase of ignition sequence if burner does not ignite.
Both black and red connections are neutral wires, blue is live.