Set Appliance State:

Mains Power Off
CH Demand
ON/OFF switch in ON position
CH temp selector to MAX
DHW temp selector to MIN
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Allow boiler to fire and start to heat the system.
Remove demand via external controls.
Does the pump continue to run to dissipate the heat from the boiler?
Note:
The pump should continue to run for approximately 6 minutes.