Set Appliance State:

CH Demand
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Allow the boiler to run on central heating mode for a few minutes.
Switch off the central heating demand and monitor the pump and fan.
The fan should over run for approximately 20 seconds, whilst the pump should overrun in accordance with the setting on the main PCB contact (see table below).
Contact PositionPump over run behaviour
Contact 1Approximately 20 seconds
Contact 2Approximately 20 seconds
Contact 3Pump runs continuously
Contact SApproximately 5 minutes

Do the fan and pump over run as expected?