Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use Insulation Mat as required)
Heating switch ON
Heating switch ON
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure voltage across terminal 4 of Control Box and the mains neutral.

Isolate as per TOPs P4
and refit as necessary