Set Appliance State:
Mains Power Off
CH Demand
Air heater switch set to constant
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across connection 1 (pink lead) and connection 4 (neutral, blue lead) at the control module.

Isolate as per TOPs P4
and refit as necessary