Set Appliance State:
Mains Power Off
User Control to Off Position
CH Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure voltage across the red leads on the transformer terminal block.
The picture may differ from the position of the wires in the boiler but the test remains the same.
The picture may differ from the position of the wires in the boiler but the test remains the same.

Isolate as per TOPs P4
and refit as necessary