Set Appliance State:
Isolate Mains Power to appliance as per TOPs P4
Remove connector CN9 from the PCB
Remove both wires from the water pressure switch.
Remove connector CN9 from the PCB
Remove both wires from the water pressure switch.
Measurement:
Measure the resistance of each of the 2 wires coming from connector CN9 running to the system pressure switch.
Expect continuity / zero resistance.
Also visually inspect the condition of the harness.
Expect continuity / zero resistance.
Also visually inspect the condition of the harness.

Isolate as per TOPs P4
and refit as necessary