Set Appliance State:

Set Multimeter to AC Volts Set meter to measure AC Volts
Isolate Mains Power to appliance as per TOPs P4
Open the control box by removing the two securing screws and lower the access door
Draw the control board forward to allow access to the boiler control switch
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Carry out polarity check between terminals L and Earth and N and Earth on main terminal connector block.
Test between L and Earth should show mains voltage present.
Test between N and Earth should show mains voltage absent.