Set Appliance State:

Set Multimeter to AC Volts Set meter to measure AC Volts
Isolate Mains Power to appliance as per TOPs P4
Set the boiler control switch to H position
Open the control box by removing the two securing screws and lower the access door
Draw the control board forward to allow access to the PCB
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow fan to run and ignition sequence to commence.
Measure the voltage across the igniter connector plug marked JP2 connections 2 and 3 (blue wires) on the PCB.