Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Disconnect the flow switch at the inline connector
Make sure there is a system circulation path, (i.e. TRVs, bypass open)
Make sure there is a system circulation path, (i.e. TRVs, bypass open)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Apply a demand and check to see if flow switch continuity can be measured across the two black wires at the flow switch connector.

Isolate as per TOPs P4
and refit as necessary