Set Appliance State:
CH Demand
Isolate Mains Power to appliance as per TOPs P4
Boiler Switch in ON position
Disconnect Pilot Supply from Pilot Block
Connect `U` gauge to Pilot Supply
Boiler Switch in ON position
Disconnect Pilot Supply from Pilot Block
Connect `U` gauge to Pilot Supply
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Check for presence of gas pressure at Pilot supply.
Note:
When U-gauge is removed reconnect pilot supply to pilot block & check for gas soundness.
Note:
When U-gauge is removed reconnect pilot supply to pilot block & check for gas soundness.
Isolate as per TOPs P4
and refit as necessary