Set Appliance State:
Mains Power Off
Gas Off
CH Demand
Boiler Switch in the ON position.
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure Mains Voltage across connection 4 (Grey wire) on PCB and N (Blue wire) on Appliance Mains Power Supply Terminal Block.

Isolate as per TOPs P4
and refit as necessary