Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Remove the cap from the expansion vessel Schrader valve
Drain the boiler central heating circuit

Observation:

Attach a foot pump to the Schrader valve of the expansion vessel and check the air charge pressure is approximately 0.75 bar.