Set Appliance State:
Gas Off
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Attach U-gauge to the inlet pressure test point on the gas valve
Gas On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Monitor the inlet pressure on the U-gauge.
Does the inlet pressure remain satisfactory throughout the boiler ignition sequence?
Notes:
1. When pressure gauge is removed the pressure test point should be tightened and checked for gas tightness.
2. Before reassembly check the integrity of all disturbed gaskets and seals and replace as necessary.
Does the inlet pressure remain satisfactory throughout the boiler ignition sequence?
Notes:
1. When pressure gauge is removed the pressure test point should be tightened and checked for gas tightness.
2. Before reassembly check the integrity of all disturbed gaskets and seals and replace as necessary.
Isolate as per TOPs P4
and refit as necessary