Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
CH Demand
Gain access to main PCB wiring
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow self-check to complete.
Measure the voltage between the central brown wire (pin 3)
at X1 on the main PCB to a suitable earth point.
Mains voltage should be present.
Note:
Ensure a good connection is made or misdiagnosis will occur.