Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to DC Volts Set meter to measure DC Volts
DHW demand from programmer
DHW temperature selector to high setting
Ensure hot water storage vessel is calling for heat
Disconnect the plug connections from the gas valve solenoids (black leads)
Boiler On/Off switch Off
Attach multi-meter probes to the connections on one of the disconnected plugs
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Test 1:
Boiler On/Off switch On.
Reset lockout if necessary.
Allow fan to run and ignition sequence to commence.
After approximately 30 seconds is voltage present at the connections?
Voltage will only be present for 2 to 3 seconds as burner will not ignite.
Expected voltage approximately 38 volts DC.
Test 2:
Repeat test on the other plug.