Set Appliance State:
Gas Off
| Isolate Mains Power to appliance as per TOPs P4 |
DHW demand from programmer
DHW temperature selector to high setting
Ensure hot water storage vessel is calling for heat
DHW temperature selector to high setting
Ensure hot water storage vessel is calling for heat
Boiler On/Off switch Off
Pull forward one side of the electrode lead connector
from the control box as shown
Pull forward one side of the electrode lead connector
from the control box as shown
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Boiler On/Off switch On.
Reset lockout if necessary.
Allow fan to start, after approximately 10 - 15 seconds does a strong and consistent spark occur between the spark generator and the lead?
Note.
Sparking will last for approximately 5 seconds, then repeats after approximately 15 - 30 seconds, if lockout occurs reset until test is complete.
Reset lockout if necessary.
Allow fan to start, after approximately 10 - 15 seconds does a strong and consistent spark occur between the spark generator and the lead?
Note.
Sparking will last for approximately 5 seconds, then repeats after approximately 15 - 30 seconds, if lockout occurs reset until test is complete.