Set Appliance State:

Gas Off
Isolate Mains Power to appliance as per TOPs P4
DHW demand from programmer
DHW temperature selector to high setting
Ensure hot water storage vessel is calling for heat
Attach U-gauge to the inlet pressure test point
Gas On
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Boiler On/Off switch On.
Reset lockout if necessary.
Allow fan to run and ignition sequence to commence.
Does the inlet pressure stay constant with a pressure of at least 16.5mb?
Note:
When pressure gauge is removed the pressure test point should be tightened and checked for gas tightness.