Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use Insulation Mat as required)
Insert a link between the mains connector and the pump live at the main terminal block
Insert a link between the mains connector and the pump live at the main terminal block
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Reset boiler if required.
Does the pump now run?
If the pump has started to run does the appliance now operate?
Does the pump now run?
If the pump has started to run does the appliance now operate?