Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
DHW Demand
Ensure there is a demand for DHW i.e. hot water cylinder is cold
Set temperature selector to MAX
Gain access to PCB (use insulation mat as necessary)
Mains reset switch On
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Measure voltage across the live (brown lead) and neutral (blue lead) connection on the connector marked H1 on the main PCB.