Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to the main connector block at the front of the control box
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure for AC voltage between switch live (LS) and neutral (N) on the main connector block at the front of the control box.
Is mains voltage present ?
Is mains voltage present ?

Isolate as per TOPs P4
and refit as necessary