Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Remove connector X25 from the PCB
Remove connector from the Mass Flow Sensor
Remove connector from the Mass Flow Sensor
Measurement:
Measure the resistance across each wire in the harness from the PCB to the Mass Flow Sensor at the connections stated below in the table.
Expect continuity on each of the wires in the harness.
Also visually inspect the harness.
Note:
Each pin on the PCB connector is numbered.
| Pin on connector (X25) | Mass Flow Sensor Connector | 12 (Green) | Green |
| 6 (White) | White |
| 9 (Red) | Red |
| 7 (Black & Blue) | Black |
Expect continuity on each of the wires in the harness.
Also visually inspect the harness.
Note:
Each pin on the PCB connector is numbered.

Isolate as per TOPs P4
and refit as necessary