Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Ensure the appliance is not in lockout
Remove the spark lead from the right connection of the spark
igniter and the earth lead from the left connection
Place the earth lead near the right hand connection as shown in the photograph
Mains reset switch On
Remove the spark lead from the right connection of the spark
igniter and the earth lead from the left connection
Place the earth lead near the right hand connection as shown in the photograph
Mains reset switch On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Stand clear of spark generator.
Allow fan to run and ignition sequence to commence.
A strong and consistent spark should be seen and heard from the exposed terminal.
WARNING!
There will be three attempts at ignition before boiler should go to lockout.
Allow fan to run and ignition sequence to commence.
A strong and consistent spark should be seen and heard from the exposed terminal.
WARNING!
There will be three attempts at ignition before boiler should go to lockout.
Isolate as per TOPs P4
and refit as necessary