Set Appliance State:
Mains Power Off
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the AC voltage between the input (right hand side) of fuse F2 and a suitable neutral.
Expected voltage between 220 and 240 volts AC.
Note:
Fuse F2 is also marked T125 mA and is the uppermost of the two fuses on the PCB.
Expected voltage between 220 and 240 volts AC.
Note:
Fuse F2 is also marked T125 mA and is the uppermost of the two fuses on the PCB.

Isolate as per TOPs P4
and refit as necessary