Set Appliance State:

Gas On; Pilot On
CH Demand
Isolate Mains Power to appliance as per TOPs P4
Selector Switch in winter position
Ensure all isolation valves on boiler and radiators
are fully open
Remove Water Pump Inspection Cover
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Observe pump starts to verify pump operation.
Note:
Do not take sound or vibration as a sign of correct operation.