Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to PCB (use insulation mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage between pins 1 (red) and 2 (blue)
at connector X1 on the PCB to a suitable earth point.
Voltage should be approximately 240V AC.
Note:
This connection provides permanent 240V to both fan and pump.
at connector X1 on the PCB to a suitable earth point.
Voltage should be approximately 240V AC.
Note:
This connection provides permanent 240V to both fan and pump.

Isolate as per TOPs P4
and refit as necessary