Set Appliance State:
Mains Power Off
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Once boiler has completed its self check it should then
show "Ready" on both the left and right side, indicating
the boiler has entered standby, awaiting a request for heat.
The pump should not be running.
show "Ready" on both the left and right side, indicating
the boiler has entered standby, awaiting a request for heat.
The pump should not be running.