Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
DHW Demand
Remove fan speed control connector from fan assembly and wedge it between the fan and the fan plastic cover as shown
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Reset appliance.
Measure for DC voltage across the red lead (removed fan connector)
and terminal 2 (blue) neutral main terminal block.
Expected voltage 7.5 Vdc.
Note:
Voltage will only be present until the boiler returns to lockout.
Reset as necessary to complete the test.
Measure for DC voltage across the red lead (removed fan connector)
and terminal 2 (blue) neutral main terminal block.
Expected voltage 7.5 Vdc.
Note:
Voltage will only be present until the boiler returns to lockout.
Reset as necessary to complete the test.

Isolate as per TOPs P4
and refit as necessary