Set Appliance State:

Turn Hot Water Tap On
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Test 1.
Allow boiler to run for DHW.
Turn hot water tap off.
Does the pump overrun after demand has ended for approximately 30 - 45 seconds?
Test 2.
Allow the boiler to run for CH until the flow temp reaches 60°C.
Remove CH demand.
Does the pump overrun after demand has ended for approximately 3.5 - 4 minutes?
Note:
To reduce the heating time some radiators can be turned off.