Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Boiler drained, primary system water
Observation:
Confirm the vessel charge pressure is correctly set.
Expected pressure approximately 0.75bar / + 0.2
Expected pressure approximately 0.75bar / + 0.2