Set Appliance State:
Mains Power Off
Boiler ON/OFF switch set to ON position
Ensure No demands
Ensure No demands
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Reset boiler, press mode and ok for 2 seconds.
Allow the boiler to complete its self-check, this will take approximately 40 seconds, the boiler flow temperature should then be displayed (see note 2.)
If a fault code is present or the display does not operate correctly then choose that option from below.
Allow the boiler to complete its self-check, this will take approximately 40 seconds, the boiler flow temperature should then be displayed (see note 2.)
If a fault code is present or the display does not operate correctly then choose that option from below.