Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Remove existing wiring from the no voltage controls connector and replace it with a wire link
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Does the boiler now respond to the CH demand?
Note:
Boiler will take approximately 45 seconds after power on before responding to the CH demand.