Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
CH Demand
Attach temperate clamp to return pipe above pump as shown
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Enter the installer mode and access level A - b2 and set to 0 to turn off the siphon fill programme, remember to set this back to 1 after the test.
(click here for information on how to do this)
Allow boiler to operate on CH for at least 2 minutes.
Measure the differential between the flow temperature on the display and the return temperature on the FGA.
Differential should be approximately 25 degrees or less.
Note:
Do NOT attach a second probe to flow pipe to check differential.
This is due to an issue with the FGA Click here for information.