Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
CH Demand
Remove the outdoor temperature sensor connector (dark blue)
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Does the boiler now respond to a CH demand?
Note:
1. Fault code may be displayed but this does not affect the test.
2. Boiler will take approximately 45 seconds after power on before responding to the CH demand.