Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Unlock and remove wireless controls key (pull downwards)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
CLICK HERE if you want information on the reason for this test.
Allow the appliance to run for CH, does the system now heat correctly?
Note:
Boiler will take approximately 45 seconds after power on before reacting to demand and the system temperature will need to be monitored to see if it is now satisfactory.
Allow the appliance to run for CH, does the system now heat correctly?
Note:
Boiler will take approximately 45 seconds after power on before reacting to demand and the system temperature will need to be monitored to see if it is now satisfactory.
Isolate as per TOPs P4
and refit as necessary