Set Appliance State:
Mains Power Off
CH Demand
Central Heating Switch in Constant position
Boiler Switch in ON position
Boiler Switch in ON position
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Is mains voltage present between PL3 connection 3 (red) and connector PL1 neutral connection 8 (blue)?

Isolate as per TOPs P4
and refit as necessary