Set Appliance State:
Isolate Mains Power to appliance as per TOPs P4
Measurement:
Disconnect the Red and Black wires (1) from the Gas Valve Stage 2 Solenoid (solenoid 3) and measure the Resistance across the Solenoid.
The Solenoid Resistance should be approximately 125 ohms for SIT valve and approximately 120 ohms for Honeywell valve.
Reconnect wires after test.
The Solenoid Resistance should be approximately 125 ohms for SIT valve and approximately 120 ohms for Honeywell valve.
Reconnect wires after test.

Isolate as per TOPs P4
and refit as necessary