Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Boiler primary circuit drained and discharged
Remove the bypass valve assembly
(located directly behind low pressure switch)

Observation:

Inspect the integral bypass assembly ensuring it is clean free from blockages and restrictions and that there is a small resistance from the spring inside the valve.