Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Remove connector CN10 from the PCB
Remove connector from pressure switch
Remove connector from pressure switch
Measurement:
Measure the resistance between the pins on connector CN10 and the pressure switch connector as per the table below.
Expect continuity on each test.
Also visually inspect the harness visually for general condition and any damaged insulation.
| Connector CN10 | Pressure switch connector | Pin 1 (Black) | Black |
| Pin 2 (White) | White |
| Pin 3 (Red) | Red |
Expect continuity on each test.
Also visually inspect the harness visually for general condition and any damaged insulation.

Isolate as per TOPs P4
and refit as necessary