Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to appliance terminal strip
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the AC voltage between terminal 3 and Earth at the incoming mains terminal strip.
Expect mains voltage.
Expect mains voltage.

Isolate as per TOPs P4
and refit as necessary