Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
CH Demand
Gain access to PCB (use Insulation Mat as required)
Boiler mains switch ON
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow the ignition sequence to commence and burner to ignite.
Measure the voltage across the brown and blue leads at the diverter valve connector X6 at the PCB.