Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Remove external controls from volt free connector block, replace with a link
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Observation:
Does boiler now fire for CH?
Isolate as per TOPs P4
and refit as necessary