Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
Disconnect wires to gas valve modureg
Disconnect wires to gas valve modureg
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Allow boiler to ignite and establish.
Measure the voltage between pins 3
(yellow) and 4 (grey) at connector X2.
Voltage should be approximately 25V DC or greater.
Note:
Remember if a white PCB is fitted X2
is in a different position.
Measure the voltage between pins 3
(yellow) and 4 (grey) at connector X2.
Voltage should be approximately 25V DC or greater.
Note:
Remember if a white PCB is fitted X2
is in a different position.

Isolate as per TOPs P4
and refit as necessary