Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Test 1:
Measure the voltage between pin 4 (red) and
pin 6 (blue) at J6 connector on the control PCB.
Expected voltage approx. 5V DC.
Test 2:
Measure the voltage between pin 5 (white) and
pin 6 (blue) at J6 connector on the control PCB.
Expected voltage approx. 0V DC.
Note:
Ensure good connections are made.
Measure the voltage between pin 4 (red) and
pin 6 (blue) at J6 connector on the control PCB.
Expected voltage approx. 5V DC.
Test 2:
Measure the voltage between pin 5 (white) and
pin 6 (blue) at J6 connector on the control PCB.
Expected voltage approx. 0V DC.
Note:
Ensure good connections are made.
